Tenders divided into lots
How to choose the lots you bid for, what happens to the requirements of the other lots, and when the minimums of several lots add up.
Many tenders are divided into lots: parts of the contract that the buyer awards separately, each with its own conditions. Whether a requirement concerns your bid then depends on the lots you bid for.
Choosing the lots
When the notices divide a tender into lots, its page shows Lots you bid for above the requirements. Tick the lots you bid for and press Save the lots. Clear the choice takes the choice back. Owners, administrators and members choose the lots; viewers see the choice. Hankevo then compares the requirements again with the lots you chose, and the tender's card follows once that comparison has run.
What the choice changes
- A requirement of a lot you do not bid for does not apply to your bid and never blocks it.
- A requirement that depends on the lots waits until you choose them. It is neither met nor blocking, and the recommendation asks you to choose.
- Where the documents do not make clear which lots a requirement is for, a person decides.
- A condition that applies when you bid for several lots, or for all of them, counts only when your choice meets it.
Minimums stated lot by lot
Documents often state a minimum turnover for each lot. With one lot chosen, Hankevo compares that lot's minimum. With several, it compares the highest of their minimums and their sum: a turnover below the highest falls short either way, one at the sum or above meets either reading, and one in between waits until a person reads whether the minimums are added up. Where the documents say how the minimums combine, Hankevo follows them.
A minimum stated once for every lot, for example in the European Single Procurement Document (ESPD), does not replace the minimums of the lots. Where the two disagree, a person decides which holds.
Last checked October 26, 2026